Friday, September 27, 2013

gutters and roof damagge, ready for repair.

exhaust air pipe damage

exhaust pipe , base damage/ hole

gutters out the position

exhaust air pipe, glue lose.

roof portion sink, plywood damage.
ready for shingles replace.  

holes

gutters bat position.

gutters2 1/2" down of position

gutters stack with leaps.
 

air condition make a line fron atic to basemant.

central air condition, make a line

hose with insulation

access window for air condition 
 

make a new line for 6", air condition

3 elbow 90 grades

basquetball board and pole assembly and install with concrete.

make a hole



24" deep

18" wide


pole with concrete on level

base board position regulator.

10' high

position adjustable


clear acrylic board

absortion

Friday, September 13, 2013

LED lights installation, make holes on ceiling,




Electric hot water tank replacement.








Interior door broken.

Door damage.

recirculate air exhaust, fixture replace, outlet damage.

Exhaust air, install.

Recirculate

Outlet damage.


                                                                         Fixture replace

Corrosion bath tube damage.

Bath tube, corrosion damage.
BEFORE

AFTER

medicine cabinete and vanity with hot ,cold water and drain connection.



Drain connection

Medicine cabinet

Vanity with faucet

Vanity, medicine cabinet, toilet.