Client: Claydi
Date Started: 09/22/2012
Date Ended: 09/25/2012
Work Performed:
Kitchen tile installed and repair of the sheetrock wall behind the faucet. Detailing required due to the
amount of electrical outlets and switches found throughout the walls of the kitchen.
No comments:
Post a Comment